Screening a property portfolio for solar and storage means ranking many sites quickly on a handful of data points, the roof area, the half-hourly demand, the connection capacity and the tariff, so the sites worth a full feasibility study rise to the top before any detailed modelling is paid for. It turns a long list of buildings into a short, ordered one.

An asset manager may hold dozens or hundreds of buildings and cannot run a detailed feasibility study on each. A study takes an analyst time and the site's own half-hourly data, and most buildings in a portfolio will not repay it.

Screening a commercial property portfolio for solar and storage shortens the list cheaply. It is a first-pass ranking of every building on a few pieces of data the owner already holds, roof area, the demand profile, the grid connection and the tariff, so the small number of sites that justify a full study rise to the top of the list and an analyst's time goes where the return is largest.

What a screen uses from each site

A screen works from whatever is already on file for a building, and four things account for most of the outcome.

The roof or land area sets how much solar can be fitted, and with it the ceiling on how much the site can generate. A large roof over a small load leaves surplus that has to be exported or stored; a small roof over a large load generates less than the site could use.

The demand profile sets how much of that generation the building uses itself. A unit consumed on site displaces a full grid import, while a unit exported because nothing is drawing at the time earns only the lower export price. A building whose demand runs through the middle of the day, when solar output is highest, keeps far more of its generation than one that stands empty at noon, so the shape of the demand matters as much as its total.

The grid connection sets the headroom for both generation and storage. A battery charges through the same connection as the rest of the site, so its draw has to stay under the agreed maximum import capacity, and a site that exports is held to its agreed export capacity. A constrained connection caps what is worth fitting regardless of roof or demand.

The tariff sets what each displaced or shifted unit is worth. A high unit rate makes every self-consumed unit more valuable, and a time-of-use tariff with expensive peak bands means a battery can cut the bill by shifting consumption out of the peak hours.

What moves a site up the ranking

The biggest factor is the share of generation the building consumes itself. Each unit generated on the roof and used in the building avoids the wholesale and network cost of the import it displaces, and the Climate Change Levy with it. That levy is a tax on business energy use charged at a main rate of £0.00775 per kWh to 31 March 2026 and £0.00801 per kWh from 1 April 2026, as set out in HMRC's Climate Change Levy rates. The same unit exported earns only the export price, so two buildings with identical roofs can rank far apart on the strength of their demand profiles alone.

Storage adds a second source of value where the tariff and the peak charges support it. A battery sized to the site can reduce consumption in the half hours that set distribution and transmission charges, hold the site under its import capacity, and move consumption out of the expensive bands of a time-of-use tariff. The embedded benefits that remain after regulatory reform add to what on-site generation is worth. How much any of this amounts to depends on the building, which is why a screen ranks rather than scores against a fixed rule.

Where the screening data comes from

A site whose peak demand passes 100 kW is metered and settled half-hourly under the Balancing and Settlement Code that Elexon administers, so its consumption is recorded in half-hour blocks, 48 a day across the year. That half-hourly record is what shows when a building draws most and how its demand lines up with solar output, rather than guessing from an annual total. For larger sites in a portfolio the data for a detailed screen is therefore already on the meter.

For smaller sites below that threshold the screen falls back on annual consumption and an estimated load shape for the building type. The ranking is cruder, because an annual total hides the within-day pattern that sets how much solar a site can use, but it is enough to separate the buildings worth closer work from those that plainly are not.

Screening and feasibility as two steps

A screen gives an indicative figure for each building and an order across the portfolio. It is built to be fast and to run on data already held, so it can cover the whole estate in one pass. The numbers it produces are estimates, meant for comparison between sites rather than as a commitment on any one.

A feasibility study then takes the sites that reach the top of the screen and models each against its own half-hourly data and electricity invoice. It sizes the solar and battery, works out the annual saving, the payback and the lifetime return, and settles any landlord and tenant split where the party that owns the roof is not the party that pays the bill. The study confirms or revises the screen's estimate for the handful of sites that earn it.

One caution carries into both steps. A saving modelled with perfect knowledge of future prices overstates what a real controller reacting to forecasts can capture, so a realism discount is applied before a figure is presented as achievable.

How Lupa screens a portfolio

Lupa works each site's value out against its own half-hourly consumption data and tariff, then ranks the portfolio on the result. The platform solves a matrix of solar and battery combinations for a building and sets out the saving, the payback and the lifetime return for each, so the shortlist an asset manager takes into feasibility is ordered on what the buildings are actually worth rather than on roof area or an approximate rule.

Common questions

What does it mean to screen a property portfolio for solar and storage?
Screening is a first-pass ranking of every building in a portfolio against a few pieces of data the owner already holds: roof or land area, the demand profile, the connection capacity and the tariff. It produces an ordered shortlist of the sites most likely to repay a solar or battery scheme, so that the detailed feasibility work, which takes an analyst time and the site's own data, is spent only where the return looks largest rather than on every building in turn.
What data do you need to screen a portfolio for solar and battery storage?
The roof or land area, which sets how much solar can be fitted; the half-hourly demand profile, which sets how much of that generation the site can use itself; the agreed import and export capacity of the grid connection; and the tariff, which sets what each displaced or shifted unit is worth. Sites metered half-hourly already carry a detailed demand record. For smaller sites the screen falls back on annual consumption and an estimated profile, which is cruder but enough to rank.
How is portfolio screening different from a feasibility study?
A screen ranks many sites quickly on data already on file and gives an indicative result for each. A feasibility study models one site in detail against its own half-hourly data and electricity invoice, sizing the solar and battery, working out the saving, the payback and the lifetime return. Screening decides which buildings are worth that study; the study then confirms or revises the screen's estimate for the handful that reach it.
Which buildings in a portfolio suit solar and storage best?
Those that use most of their own generation on site rather than exporting it, because an on-site unit displaces a full grid import while an exported unit earns only the lower export price. In practice that favours buildings with daytime demand that lines up with solar output, a large roof relative to that demand, spare import capacity on the connection, and a tariff whose unit rate and peak charges are high enough for the saving to matter.